articles This is an Open-Access article distributed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/licenses/bync/3.0) which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.
Copyright © KIChE. All rights reserved.

Articles in press

상용급 ES-SAGD방식의 오일샌드플랜트 경제성 평가

Economic analysis of commercial scale central processing facility for ES-SAGD oilsand plant

정 문1 이홍철2 황인주2 변헌수3†
1한영대학교 화공산업공학과, 2한국건설기술연구원 환경연구본부, 2한국건설기술연구원 환경연구부, 3전남대학교 화공생명공학과
In Press, Journal Pre-proof, Available online 1 August 2025

Abstract

석유 매장량이 한정되어 있다보니 생산 난이도가 낮은 전통 석유 뿐만 아니라 기술력이 필요한 비전통 석유에 대한 생산도 이루어 지고 있다. 비전통 석유 중 많은 비중을 차지하고 있는 오일샌드 개발이 활발하다 보니 투자비 산출 등 경제성 평가에 대한 관심도 높다. 이 연구에서는 탄화수소 용매를 함께 주입하는 솔벤트-증기주입중력배출(expanding solvent steam assisted gravity drainage, ES-SAGD) 방식의 중앙처리시설 공정계통을 공정모사도구 HYSYS 이용하여 모델링하고, 생산용량 625, 1250, 2500, 5000, 10000, 20000, 40000BPD 규모에서로 열, 물질수지를 도출했다. 이 데이터를 바탕으로 경제성분석도구 APEA 이용하여 총 투자비용, 총 운전비용을 추산하고 분석했다. 생산용량 증가에 따라 유틸리티 비용, 장치비용 등 모든 비용이 전반적으로 증가했다. 다만, 총 투자비용은 비례적으로 증가했으나, 총 운전비용의 증가폭은 낮아지는 것으로 보인다. 그리고 공정시뮬레이션 결과값과 개략견적기법인 6/10 법칙으로 계산한 값을 비교함으로써 개략견적기법의 유용성을 확인했다.
Due to its limited oil reserves, it produces both conventional and unconventional oil. Oil sands development, which represents a significant portion of unconventional oil, is actively pursued. As a result, there is increasing interest in economic evaluation, particularly in the calculation of investment costs. In this study, the ES-SAGD central processing facility process system, which involves the injection of steam and hydrocarbon solvent, was modeled using HYSYS. The heat and mass balance were calculated for production capacities of 625, 1250, 2500, 5000, 10000, 20000, and 40000 BPD. Using this data, the total investment cost and total operating cost were estimated with APEA, an economic analysis tool. As production capacity increased, all costs, including utility and equipment costs, showed an overall increase. While the total investment cost rose proportionally, the increase in total operating costs slowed down. By comparing the results of these process simulations with those calculated using the 6/10 factor rule from the rough estimation technique, the effectiveness of the rough estimation method was validated.

The Korean Institute of Chemical Engineers. F5,119, Anam-ro, Seongbuk-gu, Seoul, Republic of Korea