The 200 MWe Tonghae thermal power plant CFB boiler (2-units) is the largest boiler to fire a Korean anthracite coal for generation of electric power. The #1 unit CFB has been operated commercially since October 1998, and the #2 unit CFB, which will begin commercial operation in October 1999, is currently under construction. However, there is little operational data of the large CFB combustor firing anthracite coal, so it is necessary to predict the performance of the CFB combustor with variation of the operation conditions. Therefore, in this study, the simulation of the Tonghae CFB has been carried out to predict the performance with various nominal rates, coal particle size distribution and operating conditions. The simulation results with various loads could be fitted well to the design values at the given operation conditions. At the various operation conditions, the simulation results could explain the performance of the Tonghae CFBC well.
Hannes JP, "Mathematical Modeling of CFBC: An Overview Modular Programming Frame Using a 1.5-Dimensional Riser Model," Proc. of the 12th Int. Conf. on Fluidized Bed Combustion, 455, 1993
Hannes JP, "Mathematical Modeling of Circulating Fluidized Bed Combustion," Ph.D. Thesis, RWTH Aachen, Germany, 1996
Hannes JP, Renz U, Bleek CM, "The IEA Model for Circulating Fluidized Bed Combustion," Proc. of the 13th Int. Conf. on Fluidized Bed Combustion, 287, 287, 1995
Korbee R, "Regenerative Desulfurization in an Interconnected Fluidized Bed System," Ph.D. Thesis, Delft, The Netherlands, 1995
Maitland J, Schaker Y, "Design of the 200 MWe Tonghae Power Plant Circulating Fluidized Bed Steam Generator," Proc. of the 14th Int. Conf. on Fluidized Bed Combustion, 191, 1997