Issue
Korean Journal of Chemical Engineering,
Vol.33, No.1, 1-7, 2016
Facility siting and plant layout optimization for chemical process safety
Designing the process layout in a chemical plant is a complex and multidisciplinary task requiring input from experts in fields such as chemical, civil, mechanical, and instrument engineering. Plant layout entails the allocation of a given number of facilities on a given piece of land. Determining the optimal distribution of facilities in a plant requires an optimization calculation, including a variety of distance constraints, one of which is related to process safety. A few approaches have been taken to transform consequence analysis, such as toxic gas dispersion and its mitigation as well as the risks of fire and explosions, into mathematical equations as constraints of an optimization problem. An optimization problem with constraints related to safety is not easy to solve given limitations such as nonlinearity, uncertainty, and ethical difficulties in converting human life to costs for calculation purposes. However, safety concerns have increased to the point that developing this type of approach is necessary. The objective of this study was to review the current methodologies for plant layout optimization and to resolve facility siting issues. Process safety concepts are considered with a view to identifying gaps and issues with current methods in order to develop better methodologies for designing safer layouts.
[References]
  1. Baker JA, Erwin G, Priest S, Tebo PV, Rosenthal I, Bowman FL, Hendershot D, Leveson N, Wilson LD, Gorton S, Wiegmann DA, The Report of the BP U.S. Refineries Independent Safety Review Panel (2007).
  2. Dole E, Scannell GF, Phillips 66 Company Houston Chemical Complex Explosion and Fire (1990).
  3. Joseph G, Kaszniak M, Long L, Lessons after Bhopal: CSB a catalyst for change Journal of Loss Prevention in the Process Industries, 18 (2005)
  4. Grounds CA, Natale JR, Guidelines for facility siting and layout, Center for chemical process safety of the American Institute of Chemical Engineers (2003).
  5. Mannan MS, Lees’ Loss prevention in the process industries: Hazard identification, assessment and control, 3 Ed., Elsevier Butterworth-Heinemann, USA (2005).
  6. Georgiadis MC, Macchietto S, Comput. Chem. Eng., 21, S337, 1997
  7. Jayakumar S, Reklaitis GV, Comput. Chem. Eng., 18(5), 441, 1994
  8. Jayakumar S, Reklaitis GV, Comput. Chem. Eng., 20(5), 563, 1996
  9. Penteado FD, Ciric AR, Ind. Eng. Chem. Res., 35(4), 1354, 1996
  10. Drira A, Pierreval H, Hajri-Gabouj S, Ann. Rev. Control, 31, 255, 2007
  11. Moustafa TM, Froment GF, Ind. Eng. Chem. Res., 42(1), 14, 2003
  12. Lee KY, Roh MI, Jeong HS, Comput. Oper. Res., 32, 879, 2005
  13. Hwang J, Lee KY, Comput. Chem. Eng., 63, 1, 2014
  14. Patsiatzis DI, Papageorgiou LG, Comput. Chem. Eng., 26(4-5), 575, 2002
  15. Schmidt-Traub H, Holtkotter T, Lederhose M, Leuders P, Chem. Eng. Technol., 22(2), 105, 1999
  16. Burdorf A, Kampczyk B, Lederhose M, Schmidt-Traub H, Comput. Chem. Eng., 28(1-2), 73, 2004
  17. Moore JM, Plant layout and design, Macmillan, New York (1962).
  18. Armour GC, Buffa E, Manage. Sci., 9, 294, 1963
  19. Newell RG, Algorithms for the design of chemical plant layout and pipe routing, Chemical Engineering Department, Imperial College, London. U.K. (1973).
  20. Goetschalckx M, Eur. J. Oper. Res., 63, 304, 1992
  21. Abdinnour-Helm S, Hadley SW, Int. J. Prod. Res., 38, 365, 2000
  22. Watson KH, Giffin JW, Int. J. Prod. Res., 35, 2477, 1997
  23. Huang X, Lai W, Sajeev ASM, Gao J, Information Sciences, 177, 2821, 2007
  24. Foulds LR, Hamacher HW, Wilson JM, Ann. Oper. Res., 82, 405, 1998
  25. Evans GW, Wilhelm MR, Karwowski W, Int. J. Prod. Res., 25, 1431, 1987
  26. Mavridou TD, Pardalos PM, Comput. Opit. Appl., 7, 111, 1997
  27. Castell CML, Lakshmanan R, Skilling JM, Banares-Alcantara R, Comput. Chem. Eng., 22, S993, 1998
  28. Verweij B, Ahmed S, Kleywegt AJ, Nemhauser G, Shapiro A, Comput. Opit. Appl., 24, 289, 2003
  29. Martens J, Eur. J. Oper. Res., 154, 304, 2004
  30. Wu X, Chu CH, Wang Y, Yan W, Eur. J. Oper. Res., 181, 156, 2007
  31. Bortfeldt A, Eur. J. Oper. Res., 172, 814, 2006
  32. Gomes-de-Alvarenga A, Negreiros-Gomes FJ, Mestria M, J. Intell. Manufacturing, 11, 421, 2000
  33. Balakrishnan J, Cheng CH, Wong KF, Comput. Oper. Res., 30, 1625, 2003
  34. McKendall AJR, Shang J, Kuppusamy S, Comput. Oper. Res., 33, 2431, 2006
  35. Balakrishnan J, Cheng CH, Int. J. Prod. Econ., 103, 87, 2006
  36. Amaral ARS, Eur. J. Oper. Res., 173, 508, 2006
  37. Koopmans TC, Beckmann M, Assignment Problems and the Location of Economic Activities, Econometrica, 25, 53 (1957).
  38. Pardalos PM, Rentl F, Wolkowicz H, The quadratic assignment problem: A survey and recent developments, Quadratic assignment and related problems, DIMACS Series on Discrete Mathematics and Theoretical Computer Science, American Mathematical Society, 1 (1994).
  39. Sahni S, Gonzalez T, J. Association for Computing Machinery, 23, 555, 1976
  40. Christofides N, Mingozzi A, Toth P, Eur. J. Oper. Res., 4, 243, 1980
  41. Francis RL, McGinnis LF, White JA, Facility layout and location: An analytical approach, 2nd Ed., Prentice-Hall International Series in Industrial and Systems Engineering, Englewood Cliffs, N.J. (1992).
  42. Kelachankuttu H, Batta R, Nagi R, Eur. J. Oper. Res., 180, 149, 2007
  43. Savas S, Batta R, Nagi R, Oper. Res., 50, 1018, 2002
  44. Urban TL, Int. J. Prod. Res., 25, 1805, 1987
  45. Rosenblatt MJ, Int. J. Prod. Res., 17, 323, 1979
  46. Montreuil B, A modeling framework for integrating layout design and flow network design, Proceedings of the Material Handling Research Colloquium, MaterialHandling Institute, Hebron, KY, 43 (1990).
  47. Heragu SS, Kusiak A, Eur. J. Oper. Res., 53, 1, 1991
  48. Lacksonen TA, Int. J. Prod. Res., 35, 1095, 1997
  49. Lacksonen TA, J. Oper. Res. Soc., 45, 59, 1994
  50. Realff MJ, Shah N, Pantelides CC, Comput. Chem. Eng., 20(6-7), 869, 1996
  51. Xie W, Sahinidis NV, Comput. Chem. Eng., 10.1016/j.compchemeng.2007.1005.1003., 2007
  52. Barbosa-Povoa AP, Mateus R, Novais AQ, Int. J. Prod. Res., 40, 1669, 2002
  53. Papageorgiou LG, Rostein GE, Ind. Eng. Chem. Res., 37(9), 3631, 1998
  54. Barbosa-Povoa AP, Mateus R, Novais AQ, Ind. Eng. Chem. Res., 41(15), 3610, 2002
  55. Westerlund J, Papageorgiou LG, Westerlund T, Comput. Chem. Eng., 31(12), 1702, 2007
  56. Guirardello R, Swaney RE, Comput. Chem. Eng., 30(1), 99, 2005
  57. Sherali HD, Fraticelli BMP, Meller RD, Oper. Res., 51, 629, 2003
  58. Xu G, Papageorgiou LG, Chem. Eng. Res. Des., 87(6A), 780, 2009
  59. Xu G, Papageorgiou LG, Ind. Eng. Chem. Res., 46(1), 351, 2007
  60. Ozyurt DB, Realff MF, AIChE J., 45(10), 2161, 1999
  61. Park PJ, Lee CJ, Korean Chem. Eng. Res., 52(4), 475, 2014
  62. Patsiatzis DI, Knight G, Papageorgiou LG, Chem. Eng. Res. Des., 82(5), 579, 2004
  63. Diaz-Ovalle C, Vazquez-Roman R, Mannan MS, An Approach to Solve the Facility Layout Problem Based on the Worst-Case Scenario, Journal of Loss Prevention in the Process Industries, In Press, Accepted Manuscript, 385 (2010).
  64. Jung SH, Ng D, Lee JH, Vazquez-Roman R, Mannan MS, J. Loss Prev. Process Ind., 23(1), 139, 2010
  65. Vazquez-Roman R, Lee JH, Jung SH, Mannan MS, Comput. Chem. Eng., 34(1), 122, 2010
  66. Diaz-Ovalle C, Vazquez-Roman R, Jung S, Mannan MS, Comput. Chem. Eng., 26, 93, 2009
  67. Diaz-Ovalle C, Vazquez-Roman R, de Lira-Flores J, Mannan MS, Comput. Chem. Eng., 56, 218, 2013
  68. Diaz-Ovalle C, Vazquez-Roman R, Lesso-Arroyo R, Mannan MS, J. Loss Prev. Process Ind., 25(6), 974, 2012
  69. de Lira-Flores J, Vazquez-Roman R, Lopez-Molina A, Mannan MS, J. Loss Prev. Process Ind., 30, 219, 2014
  70. Ramirez-Marengo C, Diaz-Ovalle C, Vazquez-Roman R, Mannan MS, J. Loss Prev. Process Ind., 35, 249, 2015
  71. Jung SH, Ng D, Diaz-Ovalle C, Vazquez-Roman R, Mannan MS, Ind. Eng. Chem. Res., 50(7), 3928, 2011
  72. Medina-Herrera N, Jimenez-Gutierrez A, Grossmann IE, Comput. Chem. Eng., 68, 165, 2014
  73. Park K, Koo J, Shin D, Lee CJ, Yoon ES, Korean J. Chem. Eng., 28(4), 1009, 2011
  74. Han K, Kim YH, Jang N, Kim H, Shin D, Yoon ES, Ind. Eng. Chem. Res., 52(22), 7274, 2013
  75. Jung S, Ng D, Laird CD, Mannan MS, J. Loss Prev. Process Ind., 23(6), 824, 2010
  76. Georgiadis MC, Schilling G, Rotstein GE, Macchietto S, Comput. Chem. Eng., 23(7), 823, 1999
  77. Yoon H, Park J, Lim W, Lee K, Choi N, Lee C, Moon I, Korean J. Chem. Eng., 30(7), 1368, 2013
  78. Yang JM, Ko BS, Park C, Yoo B, Shin D, Ko JW, Korean J. Chem. Eng., 31(3), 393, 2014
  79. API, Management of Hazards Associated with Locations of Process Plant Permanent Buildings, American Petroleum Institute Washington DC (2009).